RedcoolMedia favicon

San Leandro Tech Campus

Free download San Leandro Tech Campus video and edit with RedcoolMedia movie maker MovieStudio video editor online and AudioStudio audio editor onlin

This is the free video San Leandro Tech Campus that can be downloaded, played and edit with our RedcoolMedia movie maker MovieStudio free video editor online and AudioStudio free audio editor online

VIDEO DESCRIPTION:

Play, download and edit the free video San Leandro Tech Campus.

This certified LEED Gold technology-focused campus is located adjacent to the Downtown San Leandro BART station and AC Transit BRT for easy commuting. Featuring energy-efficient, cost-saving operational technologies that includes smart windows, utility services and HVAC systems, remote monitoring and control, improved security systems, and responsive lighting. SLTC connects directly to Lit San Leandro’s fiber optic network, and said to offer the fastest broadband speeds in the nation to date.

The San Leandro Tech Campus is a 500,000 square foot project that is being completed in three phases. Phase I of the project is complete and consists of a 132,715 square foot office building and parking structure, as well as a 120,000 square foot tenant improvement for OSIsoft, LLC, and a 6 level 270,816 square foot parking garage. The core and shell of the Phase 2 office building in the San Leandro Tech Campus is completed. Finished in August 2018, the office building includes a second six story office building, with it’s exterior being identical to the office building in Phase I. The third and final phase is still being designed and could feature another office building or a hotel.

The grounds of the campus is designed with an urban style that offers pathways for pedestrians and outdoor collaborative areas for socializing and work. The campus is also home to the Truth is Beauty, a 55-foot vertical, 13,000 pound sculpture by Marco Cochrane. Truth is Beauty is the second in a series of three monumental sculptures, The Bliss Project of a woman and Deja Solis. This steel sculpture of a nude woman symbolizes a woman who is powerful, safe, and free. The sculpture had it’s debut at the Burning Man in 2013 and is permanently placed as the centerpiece of the San Leandro Tech Center.

The 120,000 square foot tenant improvement for OSIsoft, LLC began construction almost immediately after Phase 1 was completed. The company leasing the office wanted the flexibility of open space while still incorporating the structure of enclosed rooms. What was constructed is a healthy balance of the two with an abundance of open space with just right amount of enclosed offices, conference rooms, and collaboration areas. Focused on their company culture and employee retention, the first floor of the OSIsoft tenant improvement incorporates a 4,700 square foot dining and cafe area, three training and exercise rooms ranging from 650 square feet to 750 square feet, employee shower and locker rooms, and a break room.

Download, play and edit free videos and free audios from San Leandro Tech Campus using RedcoolMedia.net web apps

Ad

Ad